Hunter Gas Main

ANSI 300 regulation skid designed to accommodate up to 500 MCFH built for a major utility system expansion in Central Ohio. The system integrates dual run pressure control with bypass and cellular alarm/reporting capabilities.

Hunter Station ANSI 300 regulation skid designed to accommodate up to 500 MCFH built for a major utility system expansion in Central Ohio.
CATCO catalytic heater on a natural gas station skid, seen from below against a blue sky.
Honeywell ERX 350 pressure recorder mounted on station piping, showing a live pressure reading.
Honeywell MIWI communications enclosure with a solar panel, post-mounted at a fenced gas station.
Three Trerice pressure gauges on manifold piping at the Hunter station, with a green field behind.
Bolted flange connections on a natural gas manifold, mounted on steel supports inside a fenced station.
CATCO catalytic heater on a natural gas station skid, seen from below against a blue sky.
Honeywell MIWI350 telemetry enclosure and solar panel mounted on a fence post beside a cornfield.
Row of pressure gauges and instrument taps welded along a natural gas manifold header at a fenced station.
Mooney regulator on bolted flanged piping at a natural gas station, with catalytic heaters behind.
Natural gas regulation skid with twin handwheel valves, bolted flanges and solar-powered telemetry.
Trerice pressure gauge and Balon ball valve on painted piping at a fenced natural gas regulator station.
Hunter GAS MAIN

Project facts

Client

Midwest Utility Operator

location

Morrow County, Ohio

delivered

September 2025

pressure class

ANSI 300

flow capacity

500 MCFH

the build

Dual Run Pressure Control with Bypass.

Safety & Accountability

Hydrostatically tested at 1.5X MAOP and held under observation for 12 hours. Test results captured on regularly calibrated pressure recording equipment.

Documentation

Shipped with bound and digital project documentation covering every aspect of fabrication and testing, including Weld & Heat Lot Mapping, Material Test Reports, Radiographic Test Results, API 1104 Weld Certifications and Weld Procedure Documentation & Procedure Qualification Records, Operational & Pressure Test Reports, Instrumentation Calibration Records, and comprehensive Manufacturer Equipment Literature and Compliance documentation.

Next Steps