Hunter GAS MAIN
Project facts
Client
Midwest Utility Operator
location
Morrow County, Ohio
delivered
September 2025
pressure class
ANSI 300
flow capacity
500 MCFH
Custom setting design for a multitude of measurement and regulation applications, ranging from light residential/commercial to high pressure/capacity district and end-user scenarios.
ANSI 300 regulation skid designed to accommodate up to 500 MCFH built for a major utility system expansion in Central Ohio. The system integrates dual run pressure control with bypass and cellular alarm/reporting capabilities.












Midwest Utility Operator
Morrow County, Ohio
September 2025
ANSI 300
500 MCFH
Hydrostatically tested at 1.5X MAOP and held under observation for 12 hours. Test results captured on regularly calibrated pressure recording equipment.
Shipped with bound and digital project documentation covering every aspect of fabrication and testing, including Weld & Heat Lot Mapping, Material Test Reports, Radiographic Test Results, API 1104 Weld Certifications and Weld Procedure Documentation & Procedure Qualification Records, Operational & Pressure Test Reports, Instrumentation Calibration Records, and comprehensive Manufacturer Equipment Literature and Compliance documentation.
Each project represents capability and execution
We handle projects from initial concept through final commissioning. Let's talk about yours.